Revealed by Jessica Casey,
Deputy Editor
LNG Business,
TotalEnergies has introduced the supply of a primary LNG cargo to the Dhamra LNG terminal, positioned within the state of Odisha on the east coast of India. The LNG terminal is owned and operated by Adani Whole Non-public Restricted (ATPL), a 50-50 three way partnership between TotalEnergies and Adani. This supply allows the gradual commissioning of the terminal, which is anticipated to begin industrial operations on the finish of Might 2023.
With regasification capability of 5 million tpy of LNG, the Dhamra LNG terminal provides greater than 10% to India’s regasification capability, strengthening the nation’s place because the world’s fifth largest LNG importer and permitting it to extend the share of pure gasoline in its power combine from 8% to fifteen% by 2030 to cut back its carbon depth.
“We’re happy to have accomplished the primary supply of LNG to the brand new Dhamra LNG terminal, developed in partnership with Adani, with a cargo from Qatar. India desires to develop the usage of pure gasoline to cut back the carbon depth of its power combine by changing coal, and LNG can subsequently meet rising home demand. The commissioning of the Dhamra terminal displays TotalEnergies’ ambition to assist India’s power transition and provide safety,” stated Thomas Maurisse, Senior Vice President LNG at TotalEnergies.
Learn the article on-line at: https://www.lngindustry.com/regasification/17042023/totalenergies-announces-delivery-of-first-cargo-to-dhamra-lng-terminal/