OLT completes uninstallation of Livorno Terminal

[ad_1]

OLT Offshore LNG Toscana has confirmed that the uninstallation operations of the FSRU Toscana terminal off the coast of Livorno have been efficiently concluded.




The Terminal will now be towed, with the help of two tugs, to the port of Genoa, the place it should stay on the dock for a few month to start the primary section of the extraordinary upkeep intervention aimed toward changing the bearing of the anchoring system, a system designed and constructed to make sure the rotation of the Terminal across the geostationary turret completely anchored to the seabed.

Following a young process, the corporate awarded the contract for the upkeep interventions to San Giorgio del Porto S.p.A.

It’s anticipated that in early June FSRU Toscana terminal will then be towed to the port of Marseille, as soon as once more on the SGdP yard, the place upkeep might be accomplished.

Shipyard actions are anticipated to be accomplished by the mid of September, to be adopted by operations to re-install the Terminal in its present website offshore Livorno. It’s anticipated that FSRU Toscana will resume operations from mid-October 2024.

 

 

For extra information and technical articles from the worldwide renewable business, learn the most recent situation of Power World journal.

Power World’s Spring 2024 situation

The Spring 2024 situation of Power World begins with a visitor remark from Discipline on how battery storage websites can function a viable resolution to curtailed power, earlier than transferring on to a regional report from Théodore Reed-Martin, Editorial Assistant, Power World, trying on the state of renewables in Europe. This situation additionally hosts an array of technical articles on electrical infrastructure, turbine and blade monitoring, battery storage know-how, coatings, and extra.

Learn the article on-line at: https://www.lngindustry.com/regasification/16042024/olt-completes-uninstallation-of-livorno-terminal/



[ad_2]

Source_link

Related posts