Skip to content
Home » 2.5 MW electrolyzer delivered for energy hub at HKN offshore wind farm

2.5 MW electrolyzer delivered for energy hub at HKN offshore wind farm

Elogen has delivered a 2.5 MW electrolyzer for the Baseload Power Hub at the Hollandse Kust Noord (HKN) offshore wind farm.

The post 2.5 MW electrolyzer delivered for energy hub at HKN offshore wind farm appeared first on Offshore Energy.

Join the conversation

Your email address will not be published. Required fields are marked *