Skip to content
Home » 370-meter-long FPSO ends two-month journey from Singapore at Brazilian field

370-meter-long FPSO ends two-month journey from Singapore at Brazilian field

  •  
  • Blog

A 370-meter-long floating storage, production, and offloading (FPSO) unit constructed by Japanese giant MODEC […]

The post 370-meter-long FPSO ends two-month journey from Singapore at Brazilian field appeared first on Offshore Energy.

Join the conversation

Your email address will not be published. Required fields are marked *