DeepOcean is close to crossing the finish line for an assignment in the North Sea, which entails the disconnection and tow of a floating production, storage, and offloading (FPSO) vessel, alongside the removal of associated subsea infrastructure on the UK Continental Shelf (UKCS).
The post DeepOcean winding down North Sea FPSO disconnection gig for TotalEnergies appeared first on Offshore Energy.