Skip to content
Home » Orient Cable installs ‘China’s first’ 66 kV dynamic line for floating wind

Orient Cable installs ‘China’s first’ 66 kV dynamic line for floating wind

Orient Cable (NBO) has installed the subsea cable for China Three Gorges (CTG) Corporation’s […]

The post Orient Cable installs ‘China’s first’ 66 kV dynamic line for floating wind appeared first on Offshore Energy.

Join the conversation

Your email address will not be published. Required fields are marked *