Skip to content
Home » Blog » Page 534

Blog

Your blog category

Out with the old FPSO after eight years, in with the new one at oil field offshore Brazil

  •  
  • Blog

An FPSO is leaving an oil field off the coast of Brazil after spending eight years there, as another unit prepares to take its place once the field’s operator, Brava Energia gets the remaining requirements out of the way. The post Out with the old FPSO after eight years, in with the new one at oil field offshore Brazil appeared first on Offshore Energy.

UK’s offshore oil & gas decom bill to hit £24.6 billion by 2033

  •  
  • Blog

Offshore Energies UK (OEUK) has outlined in its new report that decommissioning work could account for 22% of the cumulative oil and gas spend over the next ten years. The post UK’s offshore oil & gas decom bill to hit £24.6 billion by 2033 appeared first on Offshore Energy.

Norwegian duo looking into floating power hubs for offshore platforms with CCS solution

  •  
  • Blog

Techouse and electricity provider Ocean-Power – have signed a memorandum of understanding (MoU) to explore the option of developing a floating gas power plant with CO2-capture capabilities to be deployed on the Norwegian Continental Shelf (NCS). The post Norwegian duo looking into floating power hubs for offshore platforms with CCS solution appeared first on Offshore Energy.

Green shipping corridors surge by 40% worldwide, report reveals

  •  
  • Blog

Green shipping corridors – specific trade routes where the feasibility of zero-emission shipping is catalyzed by public and private action – have rapidly expanded in popularity worldwide but progress could stall without urgent action from governments to overcome a “feasibility wall”, according to a new report. The post Green shipping corridors surge by 40% worldwide, report reveals appeared first on Offshore Energy.

Seadrill’s drillship pair heading into the home stretch to start drilling job offshore Brazil

  •  
  • Blog

Seadrill has welcomed back to its rig fleet two drillships, which are getting the finishing touches out of the way to begin their new multimillion-dollar drilling assignments off the coast of Brazil, which are slated to last until the end of 2027. The post Seadrill’s drillship pair heading into the home stretch to start drilling job offshore Brazil appeared first on Offshore Energy.

Hystar launches 1.5 MW hydrogen technology project in Norway

  •  
  • Blog

Norwegian company Hystar has officially inaugurated its hydrogen technology HyPilot project at the Kårstø gas processing plant in Rogaland. The post Hystar launches 1.5 MW hydrogen technology project in Norway appeared first on Offshore Energy.