Poland’s gas transmission system operator (TSO), Gaz-System, has confirmed a steel-cutting ceremony, held in South Korea, for the country’s floating storage and regasification unit (FSRU), which will be part of a liquefied natural gas (LNG) terminal located in the Gulf of Gdańsk.
The post First steel cut for Poland’s FSRU at HD Hyundai Heavy Industries shipyard appeared first on Offshore Energy.