Skip to content
Home » Montrose Port: Work starts on Berth 3 shore power installation

Montrose Port: Work starts on Berth 3 shore power installation

  •  
  • Blog

Work is underway to install shore power at Berth 3 at Scottish Montrose Port, with operations set to go live in February 2025.

The post Montrose Port: Work starts on Berth 3 shore power installation appeared first on Offshore Energy.

Join the conversation

Your email address will not be published. Required fields are marked *