Skip to content
Home » All inter-array cables in place at Germany’s 960 MW offshore wind farm

All inter-array cables in place at Germany’s 960 MW offshore wind farm

All inter-array cables have been installed at EnBW’s He Dreiht offshore wind farm in […]

The post All inter-array cables in place at Germany’s 960 MW offshore wind farm appeared first on Offshore Energy.

Join the conversation

Your email address will not be published. Required fields are marked *