A 294-meter floating storage and regasification unit (FSRU) has arrived at the new liquefied natural gas (LNG) terminal in Stade, marking the start of commissioning preparations and bringing the facility a step closer to operations, with gas feed-in to Germany’s grid expected from November.
The post FSRU docks in Stade as LNG terminal prepares to feed gas into German grid from November appeared first on Offshore Energy.