Skip to content
Home » Van Oord’s hybrid cable layer debuts at RWE’s 1.4 GW offshore wind farm

Van Oord’s hybrid cable layer debuts at RWE’s 1.4 GW offshore wind farm

  • by

Van Oord’s new, next-generation cable-laying vessel (CLV) Calypso has begun installing cables at its […]

The post Van Oord’s hybrid cable layer debuts at RWE’s 1.4 GW offshore wind farm appeared first on Offshore Energy.

Join the conversation

Your email address will not be published. Required fields are marked *