Skip to content
Home » Well-Safe Solutions’ 1982-built rig wraps up triple P&A campaign in UK waters

Well-Safe Solutions’ 1982-built rig wraps up triple P&A campaign in UK waters

This 44-year-old rig has crossed the finish line at a multi-well subsea decommissioning campaign on the UK Continental Shelf (UKCS).

Join the conversation

Your email address will not be published. Required fields are marked *